BREAKING NEWS - - - - - - - - - -Transcom - - - - - -New Joint Venture - - - - - - Launch at Infrarail 2010 - - - - - - - - - - BREAKING NEWS - - - - - - - - Eurocom's New Web Site launch att - - - - - Infrarail 2010 - - - - - - - - - -

Eurocom Ltd.

Communications Project Engineering

 


CONTRACT HIGHLIGHTS

Eurocom has worked extensively with ‘Blue Chip’ companies both in the UK and overseas. Our approach is technically innovative and flexible. We have successfully executed large and complicated engineering projects on time and within budget.

The following list represents a cross-section of contracts delivered by Eurocom Ltd.

Detail Design and Installation of Digital Advertising Systems - CBS

As principal contractor for CBS (Viacom Outdoor Ltd) we had responsibility for the design and installation of the Digital Transformation Project on London Underground. This included the Networks for the digital escalator panels, LCDs and cross track projectors

Station Refurbishment – Metronet, BCV and SSL

Eurocom supported W.S. Atkins in carrying out the communications engineering aspects of station refurbishments on Sub-Surface and BCV lines of London Underground.

Communications System Maintenance - Tubelines JNP

Eurocom carried out the interim maintenance on behalf of Tubelines of communication systems on the first 22 Refurb stations during the 2005/2006 refurbishment programme. Eurocom also assisted Telent in taking them into the full maintenance contract.

Jubilee Line Extension Project - Marconi

Eurocom made a substantial contribution to the project management and the implementation of Communication Systems on behalf of Marconi Plc on the Jubilee Line Extension Project, and we continue to give support on LUL projects. We also received a commendation from Tube Lines for our contribution to the installation and integration of the communication systems for the April 2004 opening of the East End entrances at Canary Wharf Station.

Surveys and Designs – The ‘Connect Project’, LUL and Third Parties

From 1998 onwards, Eurocom on behalf of its clients Thales Translink and Fluor, have undertaken surveys and designs for gathering data on communication, radio and transmission assets, circuits and infrastructure on all London Underground Ltd sites.

Eurocom has provided support to London Underground Ltd and third party clients providing Communication Asset and Dilapidation Surveys, Third Party Fibre Optic and Project Surveys, and also managed third party implementation carried out on behalf of LUL.

International

Eurocom has undertaken surveys for the installation of a telecommunications network in Manaus, Brazil, and the project engineering of a SCADA system installed along a 900km oil pipeline in Pakistan as well as the Installation and Commissioning of an Air Traffic Control and Fixed Telecommunications Network in Ghana, West Africa.. This was on behalf of Repco Inc. USA.

Project Engineering GEC Singapore and Hong Kong

During 1997/98, on behalf of GEC Singapore, Eurocom undertook the project engineering and supervision of two local electrical projects. A six-man electrical management team was in Singapore and operational within 72 hrs of notification. Eurocom, on behalf of GEC Hong Kong, have also provided an installation and commissioning team to supervise local contractors on the Metropolitan Transit Rail System. Within a week of notification we had a team of twelve engineers operational on on site.

 

Cert No- OHS 92341
 

Cert No-FM77241
 

Membership No.17866

IRSE
 

 

Copyright © 2010 eurocomltd.co.uk All rights reserved.